Safety logsheets
Every log required on a New York City construction site, written for DOB, FDNY and OSHA compliance. Open any form, print it or save it as a PDF. 27 forms, free, no sign-up.
Daily Site Logs
14Superintendent daily site documentation required by DOB for all active construction sites.
Morning pre-shift safety check completed before work begins each day.
Daily inspection record for sidewalk sheds and supported scaffolding systems.
Daily perimeter fence and site barrier inspection log.
Site Safety Manager 3-page daily form: workers on site, 7 safety categories, incidents, agency inspections, shift personnel.
CSFSM 2-page daily report: FDNY gang box checklist, hot work authorization, watchperson update, observations.
18-item YES/NO/N/A maintenance checklist with rigger license, notification requirements, and SSM sign-off.
Mon–Sun weekly format covering walk-around (11 items), operation (5), and machinery (16) checks.
16-item C/NC/N/A compliance check; pressurized air and wet standpipe sections; CSFSM sign-off.
Rolling daily inspection log with defects-found flag and SSM notification requirement.
4-section YES/NO/N/A checklist: inside of car, top & back of car, tower, and hoist interior.
Pre-operation checklist covering structural, controls, electrical, safety devices, fluids, rigging, and safety measures.
14-item EES/netting checklist: installation, securing elements, gap limits, and CAZ verification.
40-row site access log tracking name, company, trade, SST#, and time in/out.
Weekly & Periodic Logs
660-row print-name and signature table for weekly safety meetings; GC, SSM name, and license # header.
SST card verification log per BC 3321.2, tracking card review date and expiration for every worker.
W1–W5 weekly items including compressor alarm test; H1 hydrostatic test record; C/NC/N/A columns.
15-shanty inspection matrix: trash, wall materials, approved heaters, electrical disconnect, and extinguisher.
20-row rolling log tracking floor/location, reshore counts, concrete placement, with SSM and CSM sign-off.
Pre-pour checklist with design (6 items) and component (6 items) sections; YES/NO/N/A; SSM and CSM sign-off.
Monthly & Equipment Logs
3Jan–Dec grid with 12 rows per extinguisher; ID, condition/notes, and SSM initials. Landscape print.
Color-coded harness log (Green/Red/Black); 3 inspection periods per item; 25 rows. Landscape print.
36-row per-strap installation record with plan reference, visual inspection, and manufacturer spec verification.
Orientation & Compliance
43-page English orientation covering PPE, fall protection, ladders, hot work, SDS, excavation, and violation policy.
Orientación de 3 páginas en español: EPP, protección contra caídas, trabajo en caliente, SDS; sección de traductor.
OSHA 10/30 certification verification and ongoing site sign-in log.
6-column hourly patrol log for COF holders; 6 inspection items per round; end-of-shift sign-off.
Not sure which logs your site requires?
Requirements vary by project type, contract and jurisdiction. Ask Chapter 33 Assistant, or contact us for a checklist built for your site.